Minutes of the NS
Division ES&H Committee
September 23, 2002
Building 88 Issues
- Many
interruptions at 88 in the past year
- K.
Gregorich’s SAA = Yellow
Not being kept up with.
87% compliance
- Need
to designate person responsible to monitor SAA
- Inspection
of SAA on 09/27/02 9AM
Safety Inspections
- Need
to schedule inspections for Non-88 areas:
- Bldg
71 & 72 – 10/30/02 10AM
Meet @ 72
- Bldg
70 – 11/13/02 10AM
- Bring
safety glasses and wear closed toed shoes
- Key
plan drawings (for bldgs to be inspected) will be distributed prior to
inspection
Training
- Some
issues with training database still being worked out
- Concern
that JHQs are not being taken and/or turned in
- Some
have not taken EHS10
- If
someone cannot attend EHS10, PLEASE let us know!
Students
- Students
need to be watched!
- Maybe
develop a form and have group leader AND students sign to show training
was given
- Will
signing a piece of paper stop incidents from happening?
- Write
procedures down as required and performed
Hazard/Safety Issues
·
Corrective actions for SAA – K. Hardy to look at
SAA regularly
·
SA report – 2 documents: Sa report and validation table
·
General safety guidelines need to be adopted
(organized system for identifying hazards)
·
HEAR forms must be filled out by
project/experiment and distributed to PIs and people who manage labs
·
Lessons Learned (Handout): Incident at student lab
·
We must show that we are using safety guidelines
for ALL whether they are here for one day or one year
Division Issues
- New
division director will be installed sometime this year
- No
change in SNO lab in Bldg 51 – mostly storage
- Next
meeting: 12/09/02
10AM