Rev 6, March 2005
Please click
here
to view the document in its entirety.
The following links open a PDF document in a new window.
Introduction
Purpose
Background
Responsibilities
Waste-Generating Organization
Waste Generator
WAA Manager (and Alternate)
EH&S's Waste Management Group Leader
Generator Assistant (EH&S's Waste Management Group)
Guidelines and Rules Specific to WAAs
Responsibilities for Establishing a WAA
Establishing a WAA
Storing Waste in a WAA
Packaging in a WAA
Storage Time Limits
Transport of Waste from a WAA to the HWHF
Spill Prevention
Controlling Fugitive Emissions
Operating and Maintaining a WAA
Inspections
Record Keeping
Preparing Containers for Pickup
Maintaining a Current WAA Contingency Plan
Closing out a WAA
Closure of Performance Standards
WAA Closure Process
Documentation Files
Appendices
Official List of Waste Accumulation Areas (WAAs)
Governing Documents and References
Example of a Waste Spill Log for a WAA
List of Figures
Figure 3-1: Inside a typical WAA
Figure 3-2: Proper Safety Equipment and Documentation for a typical WAA
Figure 3-3: Hazardous Waste Label
Figure 3-4: Hazardous Waste Accumulation Log
Figure 4-1: Hazardous Waste Accumulation Area Weekly Inspection Checklist
Quick Links
-------------------
Benchtop Treatment Guidelines
Containers
E-waste Guidelines
Gas Cylinders
Forms
Generator Assistant
Generator Guidelines
Haz Waste Pickup Schedule
Haz Waste Req
Labels/Supplies
Lab Recycling Guide
Reusable Rags
Transportation of Haz Materials
Waste Minimization Hints