Lawrence Berkeley National Laboratory masthead Search Jobs Phone Book U.S. Department of Energy logo Berkeley Lab masthead A-Z Index

Environmental Restoration Program

Photo Gallery

INTERIM CORRECTIVE MEASURES (ICMs)

THERMALLY-ENHANCED VAPOR EXTRACTION PILOT TEST: Building 7


Building 7 Thermally-Enhanced Vapor Extraction Pilot Test
Soil Gas Collection System.

 

 


Building 7 Thermally-Enhanced Vapor Extraction Pilot Test
Heater wells and central dual-phase extraction well.

 

 


Building 7 Thermally-Enhanced Vapor Extraction Pilot Test
Soil vapor treatment system.

 

 


Building 7 Thermally-Enhanced Vapor Extraction Pilot Test
Soil water (lysimeter) sampling ports.

 
Top