PILOT TESTS
SOIL FLUSHING PILOT TESTS: Building 64

Building 64 Soil Flushing
Pilot Test
Groundwater collection trench has been excavated to 4 feet to expose and
remove underground utilities. |
|
 Building 64 Soil Flushing
Pilot Test
Abandoned electric conduits crossing the site of the groundwater collection
trench. |
|
 Building 64 Soil Flushing
Pilot Test
A 24-inch shaft is being drilled for construction of the groundwater collection
trench. |
|
 Building 64 Soil Flushing
Pilot Test
Construction of injection trench inside Building 64. |
| |