|
Photo Gallery
INTERIM CORRECTIVE MEASURES (ICMs)
SOURCE CONTROL: Building 25A

Building 25A Source Control
ICM
The 30-inch shaft is being drilled for construction of the groundwater
collection trench. |
|
| 
Building 25A Source Control
ICM
A 40-feet long steel casing is being lowered into the drilled shaft. |
|
 Building 25A Source Control
ICM
A 40-feet long steel casing is removed from the trench. |
|
 Building 25A Source Control
ICM
Granular Activated Carbon (GAC) treatment system at Building 25A to treat
groundwater extracted from the trench. |
| |
| Top |
|