Lawrence Berkeley National Laboratory masthead Search Jobs Phone Book U.S. Department of Energy logo Berkeley Lab masthead A-Z Index

Environmental Restoration Program

Photo Gallery

INTERIM CORRECTIVE MEASURES (ICMs)

SOURCE CONTROL: Building 25A


Building 25A Source Control ICM
The 30-inch shaft is being drilled for construction of the groundwater collection trench.

 

 

Building 25A Source Control ICM
A 40-feet long steel casing is being lowered into the drilled shaft.

 

 


Building 25A Source Control ICM
A 40-feet long steel casing is removed from the trench.

 

 


Building 25A Source Control ICM
Granular Activated Carbon (GAC) treatment system at Building 25A to treat groundwater extracted from the trench.

 
Top