EHS masthead EHS Home LBL Home EHS Home EHS masthead

Environmental Restoration Program
 
ERP HOME
DOCUMENTS
PHOTO GALLERY
CONTACT US
LINKS
EH&S Home
PUB 3000
LBNL Home
LBNL A-Z Index
LBNL Search
LBNL Phone Book
Privacy & Security Notice

 

 

Photo Gallery

INTERIM CORRECTIVE MEASURES (ICMs)

SOURCE-REMOVAL: Building 64 VOC-Removal


Removal of VOC-Contaminated Soil at Building 64
First borehole is being drilled to excavate soil.

 

 


Removal of VOC-Contaminated Soil at Building 64
A 36-inch steel pipe is being inserted in a hole already drilled.

 

 


Removal of VOC-Contaminated Soil at Building 64
Plastic gas line (yellow), 8-inch cast iron water line, newly installed subdrain (green), and storm drain lines are seen in the excavated zone, next to the shoring.

 

 


Removal of VOC-Contaminated Soil at Building 64
Excavated area was backfilled with gravel.

 

Top