Photo Gallery
INTERIM CORRECTIVE MEASURES (ICMs)
SOURCE-REMOVAL: Building 64 VOC-Removal
 Removal of VOC-Contaminated
Soil at Building 64
First borehole is being drilled to excavate soil. |
|
 Removal of VOC-Contaminated
Soil at Building 64
A 36-inch steel pipe is being inserted in a hole already drilled. |
|
 Removal of VOC-Contaminated
Soil at Building 64
Plastic gas line (yellow), 8-inch cast iron water line, newly installed
subdrain (green), and storm drain lines are seen in the excavated
zone, next to the shoring. |
|
 Removal of VOC-Contaminated
Soil at Building 64
Excavated area was backfilled with gravel. |
|