|
Photo Gallery
INTERIM CORRECTIVE MEASURES (ICMs)
SOURCE-REMOVAL: Building 71B VOC-Removal
 Removal of VOC-Contaminated
Soil at Building 71B
Water line and storm drains are diverted to allow soil excavation. |
|
 Removal of VOC-Contaminated
Soil at Building 71B
Excavation is being backfilled with low-strength concrete. |
|
 Removal of VOC-Contaminated
Soil at Building 71B
Groundwater monitoring well MW71B-99-3R is installed in excavation area. |
|

Removal of VOC-Contaminated
Soil at Building 71B
A picture showing an excavator digging contaminated soil and placing in
a small bin to be lifted by a crane. |
|

Removal of VOC-Contaminated
Soil at Building 71B
A bin of excavated soil is being lifted for dumping into a larger bin. |
| |
| Top |
|