INTERIM CORRECTIVE MEASURES (ICMs)

SOURCE-REMOVAL: Building 71B VOC-Removal


Removal of VOC-Contaminated Soil at Building 71B
Water line and storm drains are diverted to allow soil excavation.

 

 


Removal of VOC-Contaminated Soil at Building 71B
Excavation is being backfilled with low-strength concrete.

 

 


Removal of VOC-Contaminated Soil at Building 71B
Groundwater monitoring well MW71B-99-3R is installed in excavation area.

 

 


Removal of VOC-Contaminated Soil at Building 71B
A picture showing an excavator digging contaminated soil and placing in a small bin to be lifted by a crane.

 

 


Removal of VOC-Contaminated Soil at Building 71B
A bin of excavated soil is being lifted for dumping into a larger bin.

 