Removal of PCB-Contaminated Soil inside Building 75A
Concrete Slab has been saw cut.  Soil sampling locations are shown as holes in concrete.

 

 


Removal of PCB-Contaminated Soil inside Building 75A
Soil excavation area.

 

 


Removal of PCB-Contaminated Soil inside Building 75A
Contaminated soil was removed to the depth of 5 feet.

 

 


Removal of PCB-Contaminated Soil at Building 75 J Pad
Soil excavation under the concrete slab and next to the gas lines.

 

 


Removal of PCB-Contaminated Soil at Building 75 J Pad
The excavation site is backfilled with low-strength concrete.

 

 


Removal of PCB-Contaminated Soil at Building 75 J Pad
Backfilling of excavation site has been completed.

 

 


Removal of PCB-Contaminated Soil South of Building 75 J Pad
Gas line, electric cables and other subsurface utilities are exposed.

 

 


Removal of PCB-Contaminated Soil between Buildings 75 and 75A
Excavation site.

 

 


Removal of PCB-Contaminated Soil Southeast side of Building 75A
Excavation site.

 