Photo Gallery
INTERIM CORRECTIVE MEASURES (ICMs)
SOURCE-REMOVAL: Building 75 PCB-Removal
 Removal of PCB-Contaminated
Soil inside Building 75A
Concrete Slab has been saw cut. Soil
sampling locations are shown as holes in concrete. |
|
 Removal of PCB-Contaminated
Soil inside Building 75A
Soil excavation area. |
|
 Removal of PCB-Contaminated
Soil inside Building 75A
Contaminated soil was removed to the depth of 5 feet. |
|
 Removal of PCB-Contaminated
Soil at Building 75 J Pad
Soil excavation under the concrete slab and next to the gas lines. |
|
 Removal of PCB-Contaminated
Soil at Building 75 J Pad
The excavation site is backfilled with low-strength concrete. |
|
 Removal of PCB-Contaminated
Soil at Building 75 J Pad
Backfilling of excavation site has been completed. |
|
 Removal of PCB-Contaminated
Soil South of Building 75 J Pad
Gas line, electric cables and other subsurface utilities are exposed. |
|
 Removal of PCB-Contaminated
Soil between Buildings 75 and 75A
Excavation site. |
|
 Removal of PCB-Contaminated
Soil Southeast side of Building 75A
Excavation site. |
|