Project Description

The proposed project includes demolition of existing structures (Buildings 25/25B, 55, and up to six modular trailers associated with Building 71), the construction of an approximately 43,000 gross square foot General Purpose Laboratory (GPL), and the seismic strengthening of an existing structure (Building 85). The primary project objectives include supporting Berkeley Lab’s ongoing research mission through provision of seismically safe, modern life science research space, along with improving efficiency and consolidating functions.

Additional Information
Environmental Documents

Lawrence Berkeley National Laboratory has issued environmental documents for this project. The documents are provided below in reverse chronological order by the environmental act that they address. Additionally, we have included related documents at the bottom of the page.

Most documents are in PDF format and require Adobe Acrobat Reader for viewing. You may download a free copy of the software from Adobe’s website.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)

Date Issued Document Title Comment Period (if applicable)
6/29/10 Notice of Errata – Final EIR  
6/23/10 Notice of Availability – Final EIR  
1/29/10 Notice of Availability – Draft EIR 1/29/10
to
3/15/10
12/9/08 Notice of Preparation – EIR 12/9/08
to
1/27/09
Date Issued Document Title Comment Period (if applicable)
NOTE: To facilitate faster downloading, the FEIR has been divided into parts. The full document is on the last 2 rows of this table.
6/23/10 Cover Page  
6/23/10 Table of Contents  
6/23/10 1 Introduction  
6/23/10 2 Summary  
6/23/10 3 Revisions  
6/23/10 4 List of Commentors  
6/23/10 5 Comments and Responses  
6/23/10 Full Document (63 MB)  
6/23/10 Full Document – Compressed (59 MB)  
Date Issued Document Title Comment Period (if applicable)
NOTE: To facilitate faster downloading, the FEIR has been divided into parts. The full document is on the last 2 rows of this table.
1/29/10 Draft EIR Volume I: Sections 1 – 4.0 (Introduction; Summary; Project Description; Environmental Evaluation) 1/29/10
to
3/15/10
1/29/10 Draft EIR Volume I: Section 4.1 (Aesthetics) 1/29/10
to
3/15/10
1/29/10 Draft EIR Volume I: Sections 4.2 – 7 (Environmental Evaluation con’t.; Alternatives to the Proposed Project; CEQA-Required Assessment Conclusions; Report Preparation) 1/29/10
to
3/15/10
1/29/10 Draft EIR Volume II: Appendices 1/29/10
to
3/15/10
1/29/10 Draft EIR Volume I – Entire File 1/29/10
to
3/15/10

NATIONAL ENVIRONMENTAL POLICY ACT (NEPA)

Date Issued Document Title Comment Period (if applicable)
NOTE: To facilitate faster downloading, the FEIR has been divided into parts. The full document is on the last 2 rows of this table.
8/9/10 Press Release – Final EA  
8/9/10 Notice of Availability – Final EA  
6/28/10 Press Release – Draft EA  
6/28/10 Notice of Availability – Draft EA 6/28/10
to
7/28/10
11/25/08 Notice of Preparation – EA  
Date Issued Document Title Comment Period (if applicable)
6/28/10 Cover Page 6/28/10
to
7/28/10
6/28/10 Table of Contents 6/28/10
to
7/28/10
6/28/10 Section 1 (Executive Summary) 6/28/10
to
7/28/10
6/28/10 Section 2 (Purpose and Need) 6/28/10
to
7/28/10
6/28/10 Section 3 (Proposed Actions and Alternatives) (44 MB) 6/28/10
to
7/28/10
6/28/10 Section 4 (Affected Environment and Environmental Consequences) (52 MB) 6/28/10
to
7/28/10
6/28/10 Section 5 (Cumulative Effects) 6/28/10
to
7/28/10
6/28/10 Glossary of Terms and Acronyms 6/28/10
to
7/28/10
6/28/10 Appendix A (Standard Project Features) 6/28/10

to
7/28/10